Fronius Error Message - State 102 - AC Grid Voltage too high - NSW Installation.
Ulongtimelimit increased to 258v.
Related Articles
What happens during a 'Black Out' or Power Outage with a Grid Connect Inverter
Being a 'Grid Connected' inverter - a Blackout will automatically cause the inverter to shutdown. This is to protect the technicians who maybe working on the network/grid/power lines after the blackout. If the inverter continues to show a fault code ...
NSW Infrastructure Distributor Areas
SP Ausnet Info
Customers > Electricity Customers > Solar Connections SP AusNet supports customers looking to connect a photovoltaic (PV) solar system at their installation within our electricity distribution network (across north and eastern Victoria). SP AusNet is ...
There is a flashing light with a notation of “Grid Failure”
Check the switchboard and make sure the "Solar Supply Main Switch" is turned ON. If you have had a power failure this switch may have tripped to off. Make sure after any blackouts that you make sure its ON.
Time of Use Metering
In Endeavour Infrastructure regions, we will now be sure to install a meter capable of changing to 'Time of Use' instead of the standard meter which does not allow this change. A new field in zohocrm potential page has been added under the Diamond ...